ARAYARA na Mídia: Boom and Bust 2024: Tracking the global coal plant pipeline

The global coal landscape has been in transformation for almost a decade, marked by a collapse in the amount of planned coal power plants. Coal power is at the edge of a precipice, facing political and civil opposition and increasingly uncompetitive economics. COP26 set the goal of consigning coal to history with its call to phase down unabated coal power, and COP28 strengthened the commitment by reaffirming that language alongside a call to triple renewables capacity by 2030, reflecting the growing momentum away from coal and towards clean power across the globe.

Since the adoption of the Paris Agreement in late 2015, there has been a 68% reduction in global pre-construction capacity, and new construction starts are at their lowest outside of China since data collection began.

In 2023, twelve new countries committed to No New Coal by becoming members of the Powering Past Coal Alliance (PPCA). As of January 2024, 101 countries have either formally committed to No New Coal or have abandoned any coal plans they had in the last decade. This shows a growing awareness of the need to shift to cleaner and more sustainable energy sources, even in places where coal has previously been a major part of the energy mix. At COP28, 130 countries signed the Global Renewables and Energy Efficiency Pledge, signalling their intention to phase out unabated coal power and stop investing in new unabated coal-fired power plants within this decade while ramping up renewables and energy efficiency.

Key findings:

  1. Global operating coal capacity grew by 2% in 2023, with China driving two-thirds of new additions, and a small uptick was seen for the first time since 2019 in the rest of the world.
  2. China and the ten countries following it account for 95% of the global pre-construction capacity. The remaining 5% is distributed among 21 countries, eleven of which have only one project and are on the brink of achieving the “no new coal” milestone.
  3. Outside of China and India, pre-construction capacity is currently at its lowest since data collection began, but growth in these two countries resulted in the total global capacity in pre-construction increasing by 6% in 2023.

Oyku SenlenSamora LevyHanna HakkoYoko Mulholland and Katrine Petersen from E3G contributed to this report produced by the Global Energy Monitor, the Centre for Research on Energy and Clean Air (CREA), Reclaim FinanceSierra ClubSolutions for Our Climate (SFOC)Kiko NetworkCAN Europe, Bangladesh Groups, Trend Asia, Alliance for Climate Justice and Clean Energy, Chile Sustentable, POLEN Transiciones Justas, Iniciativa Climática de México, and Arayara.

Explore the full report here.

Picture: Coal power plant at sundown near Leipzig, Germany

Compartilhe

Share on whatsapp
WhatsApp
Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn

Enviar Comentário

O seu endereço de e-mail não será publicado. Campos obrigatórios são marcados com *

Redes Sociais

Posts Recentes

Receba as atualizações mais recentes

Faça parte da nossa rede

Sem spam, notificações apenas sobre novidades, campanhas, atualizações.

Leia também

Posts relacionados

ARAYARA na Mídia: Justiça suspende uso da água do Rio Melchior na instalação da Usina Termelétrica Brasília

Impactos ambientais como a captação do uso de 110 mil litros de água por hora do rio Melchior foi um dos argumentos para embasar a decisão Uma decisão liminar do Tribunal de Justiça do Distrito Federal (TJDFT) suspendeu as outorgas de uso de água concedidas à Usina Termelétrica Brasília (UTE Brasília), megaprojeto da empresa Termo Norte Energia, atualmente em licenciamento.

Leia Mais »

ARAYARA na Mídia: Justiça do DF suspende outorgas para captação de água da UTE Brasília

Uso de recursos hídricos é indispensável para o empreendimento e etapa obrigatória para o licenciamento ambiental BRASÍLIA — O Tribunal de Justiça do Distrito Federal (TJDF) suspendeu a outorga para uso da água da usina termelétrica (UTE) de Brasília (veja a íntegra da decisão .pdf). A vara de Meio Ambiente, Desenvolvimento Urbano e Fundiário acolheu os argumentos de ação civil

Leia Mais »

Justiça suspende outorga contra o uso de água para a instalação da UTE Brasília

A ação civil pública movida pelo Instituto Internacional ARAYARA visa garantir a segurança hídrica e ambiental do Distrito Federal O Tribunal de Justiça do Distrito Federal deu um passo decisivo na defesa ambiental da capital ao suspender, por meio de liminar, as outorgas de uso de água destinadas à instalação da Usina Termelétrica Brasília (UTE Brasília), um megaempreendimento energético da

Leia Mais »

ARAYARA e Urgewald – Coletiva de Imprensa Online sobre o 5º Ciclo da Oferta Permanente de Concessão

No Caminho para a COP30: Governo Brasileiro Pretende Liberar Exploração Maciça de Novas Reservas de Petróleo e Gás Na quinta-feira, 12 de junho, às 15h (horário da Europa Central – CEST), a Urgewald convida para uma coletiva de imprensa online com: Nicole Figueiredo Oliveira, diretora  executiva do Instituto Internacional Arayara (Brasil)Nicole apresentará dados sobre a dimensão e os possíveis impactos

Leia Mais »